Berth 1 & 3 for LBC Rainbow project shipped and installed

On behalf of Geldof, MOH Service has manufactured berth 1 and 3 for the LBC’s Rainbow project.

The Rainbow project concerns the construction of a new jetty for the LBC tank terminal in the port of Rotterdam. Both constructions have been completed within project planning and have been successfully shipped by sheerleg and installed on location at LBC.

Share on:
Facebooktwittergoogle_pluslinkedinmail